Acknowledging shade is a big part of doing a load calculation. Sometimes it’s done correctly and sometimes it’s done incorrectly. The more accurate we are with our inputs the more predictable our results will be. There are hard and fast rules that should be followed in Manual J. Some of the more important ones are discussed in this article.
Latest posts by Ed Janowiak (see all)
- Hey Ed, a contractor asks when calculating for the eaves with gutters that are 29″ long and all the windows are 3″ from the top overhang – is this normal? - December 18, 2024
- Hey Ed, our code requires a supply grille in every room even if Manual J® calls for zero CFM. Any advice? - December 11, 2024
- Hey Ed, Do We Ever Try to Get Our Systems to Meet AHRI SEER2 Operating Efficiency? - October 23, 2024
Posted In: Aside, Technical Tips